Read this article in:
18 September, 2006
Following a fire in the first and second generation stations of the El-Missaub electrical heat generation station, the Federation of Works Councils Unions of Iraq (FWCUI) calls for improved safety equipment at the facility. Two workers needed to be taken to a hospital as they suffered from suffocation after trying to extinguish the fire.
The union is asking the administration of the station for increased safety measures, such as supplying the different units with personal fire protection devices, organising training on safety issues and repairing broken down safety equipment. The union also points towards the non-existence of insurance for workers in case they become the victim of an industrial accident.